Wood Pre-Installation Information

The sub-floor must be level and constructed of suitable thickness and material (discuss with installer prior to installation).

Pre-Installation Information
Suitable Subfloors
  • Thickness of underlayment must be a minimum of 3/4" in two layers.
  • APA (American Plywood Association) approved plywood underlayment for use with wood flooring
  • Concrete can be used if in good condition and structurally sound. Prior to hardwood installation, all well-bonded paint, concrete sealers and other curing agents must be thoroughly sanded. New concrete subfloors must cure at least 28 days prior to installation.
  • Resilient flooring can be used only if in good condition, uncushioned and solidly adhered to the subfloor. All finishes and waxes must be removed from the surface.
Pre-Installation Procedures
  • Remove all doors.
  • Remove wood or vinyl moldings.
  • Check for and repair any plumbing leaks.
  • Finish all painting.
  • Empty rooms which are being resurfaced.
  • Disconnect all electrical components which may be affected by the installation.
Become a member it has its advantages
Our Location Information Our Location Information
Outstanding Profit Potential Increase Your Bottom Line
The Arizona Floor Club
15575 North 83rd Way
Scottsdale, AZ 85260
Phone:
FAX:
e-mail:
480-922-9111
480-922-1444
click here
The Arizona Floor Club © 2008   |   Privacy Policy
home  |  member benefits  |  products  |  faq  |  location  |  client comments  |  site map  |  contact us